Electric Race Cars Are Here. The Paddock Power Plan Isn't.
So here is a scene you would not have predicted ten years ago. Silverstone, Goodwood, Brands Hatch, Donington, Thruxton, Croft. A wet Saturday in May. The paddock is filling up. Race transporters reversing in, hospitality units settling on the gravel, marshals doing the same things marshals have done since the Hailwood era. Except parked between the Cosworth tea van and the catering wagon there is now a row of electric touring cars, an electric GT class on the next bay, three Formula E demonstrators on a tour, and a paddock full of customer cars that all want a top up before the drive home. And the National Grid connection at this circuit was sized in 1974.
That is the problem nobody is shouting about yet. Motorsport has gone electric faster than anyone in the paddock catering tent will admit, and the supporting infrastructure is still running on a substation that was put in when most of the cars on the grid had carburettors. Pretty soon, somebody is going to lose a race weekend because the chargers tripped out.
Race weekends are the worst possible load shape
Look at how a circuit actually uses power. Fifty one weekends a year you have a handful of test days, a driving school, some corporate hospitality, the odd track day. The load is modest. Then on race weekend you have the broadcast trucks, the timing gantry, hospitality marquees running ovens and aircon, paddock teams with diagnostic rigs, and now an entire grid of cars that need charging between sessions. Add in the fans turning up in EVs expecting a top up while they watch and you have a load curve that looks like Box Hill on a Sunday morning. Spiky, brief, and absolutely brutal on the kit.
Most circuits sit in rural locations precisely because nobody wanted them in a residential area, which is exactly why the local DNO connection is thin. The cost of an upgrade is the kind of number that gets a chairman reaching for the brandy. Three quarters of a million for a transformer upgrade is not unusual, and the lead time runs to two or three years. By which point the touring car championship has gone fully electric, the support paddock is full of Cup EVs, and the chairman is reaching for the brandy again.
What a properly thought through paddock looks like
This is where you stop trying to drag a Victorian grid into the 2030s and start thinking like a project finance person. Do not build a permanent substation upgrade for fifteen race weekends a year. That is a daft use of capital. Instead, drop in containerised battery buffered charging that turns up for the weekend, does its job, and recovers overnight from whatever connection you do have.
FreeMe in a 20ft or 40ft container parked behind the support paddock gives you a megawatt of dispatchable output without touching a spade. The battery buffer means you trickle off the existing grid through the week and discharge through race weekend at the rate teams actually need. No ground works, no road closures, no DNO application, no nervous phone calls about whether the grid connection will hold up when the safety car comes out and twenty cars all plug in at once.
For paddock hospitality and team garage charging during the meeting itself, TitanMe Max sat on a 5 tonne platform gives you 100kWh of LTO storage and 200kW of DC output where you need it, when you need it. Move it round the paddock between sessions. Park it next to the championship that is on track next. The cars get charged, the team principal stops shouting, the broadcast goes on time.
The bit nobody factors in: the visitor car park
Here is the thing the circuit owners often miss. A race weekend brings in twenty, thirty, sometimes fifty thousand fans. A growing chunk of them now arrive in EVs. They sit in the car park for eight to ten hours. That is the single best dwell time in the entire UK charging market. Better than supermarkets, better than airports, better than hotels. And yet most circuits have either no public chargers at all or four rapids on a corner of the south car park that get smashed by the first twenty arrivals and then trip out for the rest of the day.
A properly sized FreeMe deployment in the visitor car park is a separate revenue line that runs every event, not a cost centre. Under our Energy as a Service model, PowerMe funds and operates the kit and the circuit takes a share of the energy revenue for providing the land. No capex, no ops headache, no procurement saga. The chairman keeps the brandy in the cabinet.
Motorsport without the diesel generator finally makes sense
The other piece worth saying out loud. Every paddock in the country is still running on diesel gensets for the bits the mains cannot cover. Hospitality power, broadcast power, charging power, all of it humming away on red diesel in front of a series sponsor banner that says Net Zero by 2030. The optics are not great and the maths gets worse every year as fuel duty changes and emissions reporting tightens. Containerised battery buffered charging plus a leased mobile unit or two for the surge load gives you a properly clean paddock, a number for the sustainability report that actually adds up, and a story the broadcaster will be glad to tell.
Whether you sit at Silverstone, Brands, Donington or one of the smaller venues, the path to an electric race weekend does not run through the DNO upgrade queue. It runs through kit that turns up, plugs in and does the work. We will happily come and walk the paddock with you.